We get our industrial data from projects like: Distribution Facility, Manufacturing Facility, Warehouse, Chemical plant, Hangars.
The below are scope notes
460,000 SF rail car manufacturing facility. Scope includes 20,000 SF of two story office area, rail tracks
32 feet high, 37 dock doors, two drive-in doors, convertible freezer room, truck dock, battery charging/maintenance room, electrical room and support areas. Final storage rack cleaning. Scrub770,000 sf warehouse floor. Employee lounge and locker room area. Single-story structure would be 32’ in height and include a nearly 6KSF office with 27KSF of warehouse space for a total of 33KSF.
Proposed building materials include painted concrete tilt-up panel walls of various textures, accented metal entries, and exposed steel canopies.
8,000-amp electrical service; 55′ x 53′ bay spacing with 55′ x 60′ spacing at the staging bays; and LED high-bay warehouse light fixture. Rent 40ft scissor lift to clean the joist,
Awarded Projects To Date –
Industrial
Opportunity Name | Total Contract Amount | Account Name | State | Close Date |
---|---|---|---|---|
Kuraray chemical plant | 16660.50 | Gray Construction | TX | 12/29/2013 |
Admiral Linen | 3100.00 | ARCO / MURRAY | TX | 1/31/2014 |
GreenParke One – Indianapolis-floor scrub | 1950.00 | Enterprise Electrical & Mechanical Co. | IN | 11/27/2013 |
Ground Source heat pump | 3150.00 | OPCON, INC | IN | 3/5/2014 |
Meijer 872 Renovation | 18800.00 | Gray Construction | WI | 1/22/2014 |
GreenParke One – Indianapolis, IN | 9400.00 | Catamount Constructors | TN | 9/17/2013 |
PFS Hialeah | 28000.00 | CAMPANELLI Construction | FL | 6/3/2014 |
Sysco Jacksonville | 11500.00 | PRIMUS BUILDERS | FL | 5/23/2014 |
Briggs Warehouse | 10000.00 | Catamount Constructors | GA | 10/4/2013 |
Crooked creek | 5300.00 | Catamount Constructors | GA | 3/12/2014 |
Nippon Sharyo Manufacturing Facility | 27000.00 | Kajima Building & Design Group, Inc. | IL | 3/22/2014 |
Clark/LaSalle – Division Red Line | 5300.00 | FH Paschen | IL | 6/17/2014 |